Opening your workspace…

EAST BAY GRAFFITI / RVC CREW 1071
◌
--°Locating…
--:--—

TABLET LOCATIONS

Live crew tablet locations · Administrator access

Opening tablet locations…

LIVE EQUIPMENT DATA

GRACO PUMP MONITOR

Real-time pump readings and alerts from the crew tablet.

Waiting for live connection

Open the app near the pump and connect the tablet to begin receiving readings.

PAINT INVENTORY

One shared total for all paint colors.

Gallons Started With—
Gallons on Hand—

Open inventory to load the current balance.

PAINT CALCULATOR

Estimate the area covered by your paint.

Estimated square footage—

Coverage rate: 400 sq ft per gallon, matching the job form.

Profile

Choose a photo, then click Save profile.
Name
Email
Position

Caltrans Bay Area

EAST BAY

GRAFFITI MANAGEMENT SYSTEM

QUICK ACTIONS

CSR Inbox

Loading CSR Inbox…

Connect Google Data to load CSR Inbox.

Add CSR

Create a new Customer Service Request

CSR Location

Search or drop a pin on the map.

Paste coordinates below to place the pin.
REFERENCE PHOTOS (Up to 5 · Optional)

CSR Information

Location Details Auto-filled from map
Direction
Auto-filled from map
Work Details
GRAFFITI TYPE
Select graffiti type
RIGHT OF WAY
Select right of way
FIELD CREW WORKFLOW

FREELANCE JOB

Set the job location to begin.

JOB LOCATION

Use Locate, tap the map, or drag the pin. Location information updates automatically.

Tap the map or use Locate to set the job location.

JOB INFORMATION

New Request

Report graffiti and help the crew find it.

Graffiti Location

Search or drop a pin on the map.
Use Locate or tap the map to select the graffiti location.
Reference Photos (Up to 10)0 / 10 Photos

Requester

Location Details Auto-filled from map

DIRECTION
Auto-filled from map

Work Details

RIGHT OF WAY
Select right of way
GRAFFITI TYPE
Select graffiti type
PAINT COLOR NEEDED

Select all colors needed.

CREW 1071

Open Jobs

Open0OPEN
Priority0PRIORITY
In Progress0IN PROGRESS
Completed0COMPLETED

Current Open Jobs

Loading open jobs…

Completed Jobs

COMPLETED MONTH JOBS

Select a workday to view its Daily Route.

0 Completed Jobs
0 Total Miles
0 Total Gallons
0 Total Sq Ft
SUN MON TUE WED THU FRI SAT
Regular Work Overtime Callout Click a day with jobs to view its route.

DAILY ROUTE

View route and completed work for the selected day.

0 Stops
0 Total Miles
0 Total Gallons
0 Total Sq Ft

ROUTE / JOBS

Route History
CSR Freelance Requests

NOTES / COMMENTS

No notes for this route.

DAY SUMMARY

Settings

Manage display, maps, notifications, and account preferences.

Appearance

Customize how the app looks and feels.

Personal backgroundUse your own image throughout the app
No custom background selected

The default background is active. Freddy is available.

Data & syncing

Review the app connection and refresh data.

Last synchronizationUpdated when live data refreshesLive
Crash reportsChecking this tablet…Checking…

Map preferences

Choose the default field-map behavior.

Notifications

Control operational alerts.

Job preferences

Set defaults for job lists and actions.

Help & system

Support and application information.

App versionGraffiti Management Systemv84
Privacy & accessibilityPolicies and accessibility information›
ACTIVE JOB

FINISH JOB

Enter the completed work information and photos.

Job—
Location—
Started—
Elapsed Time—

✓ COMPLETION INFORMATION

📷 BEFORE PHOTOS 0 / 5
📷 AFTER PHOTOS 0 / 5

PAINT SPRAYER

Graco pump

Not connected

Pump controls and gallons tracked per job will appear here when the Graco integration is connected.

BEFORE PHOTOS

Capture the job before beginning work. Photos stay in this session until the completion workflow handles them.

Job status syncs to the Sheet when connected. Pump connection will be added later.